KJH60 Thin Metal Plate Flying Shear Cut To Length Line
I.Introduction of the trapezoid cutting line
The production line is a thin metal coil leveling and cut into a massive sheet of special equipment. Usually cited by the feeding car, uncoiler, pallet pressure device, leveling host activities across the bridge, guide corrective devices, length agencies, film equipment, shears, conveyor table, pneumatic discharge rack, hydraulic lift the composition of the pile material, material transport roller and hydraulic system, electrical control system, the concerted action of PLC control. The main hydraulic, pneumatic and electronic control components, cut to length system selected international brands.
This equipment is mainly used for processing cold-rolled carbon steel coil, stainless steel coil, and non-ferrous metal coil, configuration, six-leveler to the entire pacification of long shear plate surface of the metal aluminum and other high coil .
According to customer requirements, the fine two leveler leveler leveler can be used early; fixed length sent to shear can be ordinary mechanical appliances collaborative action, digital variable frequency or AC servo technology; shears can be equipped with the ordinary machinery, hydraulic press type electromagnetic clutches, pneumatic clutch transmits power high-speed gate shears, mobile tracking the chase cut and rotary flying shear machine. Supporting related molding machine can be used for a wider range extension.
II.Technical data
Model | Thickness (mm) |
Coil Weight(t) | Coil Width (mm) | Line Speed (m/min.) |
cutting accuracy | Leveling accuracy | ||||||
KJF60-2*650 | 0.2 - 2.0 | 3、5 | 150 - 650 | 10 - 60 | ±0.2 | 1.2 | ||||||
KJF60-2*850 | 0.2 - 2.0 | 5、10 | 150 - 850 | 10 - 60 | ±0.2 | 1.2 | ||||||
KJF60-2*1050 | 0.2 - 2.0 | 10、15 | 300 - 1050 | 10 - 60 | ±0.2 | 1.2 | ||||||
KJF60-2*1300 | 0.3 - 2.0 | 10、15 | 300 - 1300 | 10 - 60 | ±0.2 | 1.2 | ||||||
KJF60-2*1600 | 0.3 - 2.0 | 15、20 | 300 - 1600 | 10 - 60 | ±0.2 | 1.2 | ||||||
KJF60-3*650 | 0.2 - 3.0 | 3、5 | 150 - 650 | 10 - 60 | ±0.2 | 1.2 | ||||||
KJF60-3*850 | 0.2 - 3.0 | 5、10 | 150 - 850 | 10 - 60 | ±0.2 | 1.2 | ||||||
KJF60-3*1050 | 0.2 - 3.0 | 10、15 | 300 - 1050 | 10 - 60 | ±0.2 | 1.2 | ||||||
KJF60-3*1300 | 0.3 - 3.0 | 10、15 | 300 - 1300 | 10 - 60 | ±0.2 | 1.2 | ||||||
KJF60-3*1600 | 0.3 - 3.0 | 15、20 | 300 - 1600 | 10 - 60 | ±0.2 | 1.2 |
III.Layout
IV. main machine
1. Coil car
2. Decoiler
3. Peeler table
4. Precision leveler
5. Loop Bridge
6. Side Guide Roller
7. Servo feeder
8. Rotary shear Machine
9. Conveyor table
10. Stacking table
12. Lifting table
13. Hydraulic Systems
14. Pneumatic Systems
15. Electrical System PLC Control
V. We will be in the equipment arrival, immediately arrange overseas after-sales service engineer in 15 working days or so to complete equipment installation and commissioning work,we have established steady cooperation with customers in over 58 countries. Please feel free to contact Mr. Joe cheng for more details in case you need.